Saturday, November 19, 2011

I am back

After soo long x update blog due to laptop rosak and xde laptop sepanjang tu..lepas tu broadband issue pulak..

I already moved here since last saturday (13th Nov)..almost a week already..Let see what i have done so far.


Phase1 (july-july 2012)



1-Grille-done
2-Downlights-1st floor
3-Plaster ceiling ground floor+downlights+change all the switches.
4-Buy KDK fans+Fridge+Plasma and install
5-Buy wall light and main light
6-Cleaning and Painting
7-Sliding door tinted+curtains. (tinted all)
8-Buy toilet accesories (heater, mirror, handle n etc)
9-Buy washing machine+tilam vono+meja makan kecik (additional)
10-Install astro (additional)

Phase2 (july 2012-july 2013)


1-Kitchen Cabinet+hood+hob+sink+tab
2-Buy washing machine
3-Master Bedroom renovation (install mini wardrobe+room set)
4-Buy dining table
5-Buy sofa


Phase3(july 2013-july 2014)
1-Complete each room furniture